Room Integrity Testing

Room Integrity Testing, also known as Door Fan Testing, checks whether a protected room can retain the required clean agent concentration after discharge.

Clean Agent Fire Suppression

Room Integrity Testing for Clean Agent Fire Suppression Systems

Great Win Fire & Safety LLC provides room integrity testing, also known as door fan testing, in Dubai and Abu Dhabi. We test server rooms, data centres, electrical switchgear rooms, control rooms and other enclosures protected by FM-200, Novec 1230, IG-541, IG-55 and IG-100 total flooding systems.

A clean agent system relies on the room to retain the extinguishing agent after discharge. An unsealed cable opening, a poorly fitting door or a ventilation damper that stays open can allow agent to escape.

A door fan test measures enclosure leakage without discharging the extinguishing agent. We use the measurements to predict how long the required agent concentration will be maintained at the specified protection height. This is called the hold time.

Room integrity door fan testing for clean agent fire suppression
Testing Requirements

When to Arrange a Room Integrity Test

Room integrity testing is important whenever a protected enclosure is newly installed, modified or repaired.

01

New Installation and Commissioning

Once doors, ceilings, penetrations and ventilation works are complete, testing verifies whether the finished enclosure meets the design hold-time requirement before handover.

02

Fit-Out or Refurbishment

New partitions, replacement doors, raised-floor alterations or changes to a ceiling void can change the boundary of the protected space.

03

Cable, Pipe or Ventilation Works

A new cable tray through a server room wall or a replacement duct damper can create a leakage path in a room that previously passed.

04

Rectification After a Failed Test

Retesting after repairs gives the building owner and consultant a measured result for the repaired enclosure.

05

Review of an Existing Installation

Where the room has changed or its previous test conditions are unclear, we review the available records and agree the testing scope with the facility team.

Our Process

What Our Testing Service Includes

Our testing process covers enclosure review, controlled measurements, hold-time calculations and identification of corrective work where required.

01

Review the Protected Enclosure

We check the room drawings, agent type, design concentration, required hold time and height of the equipment being protected. We confirm whether raised floors and ceiling voids are included in the suppression design and identify the walls, floors and ceilings that form the enclosure boundary.

02

Agree the Test Conditions

With the facility team, we confirm how doors, ventilation equipment and dampers are intended to operate during the retention period. For live server and control rooms, we plan access and any cooling interruptions with the operator. We record the actual conditions so the result can be interpreted correctly.

03

Measure Leakage and Calculate Hold Time

We temporarily install a calibrated fan assembly in a doorway and measure airflow at controlled pressure differences. The readings are used to calculate the enclosure’s equivalent leakage area and predict agent hold time. We compare the result with the acceptance criteria in the approved design and applicable project standard, such as NFPA 2001 or ISO 14520.

04

Identify Corrective Work Where Needed

If the predicted hold time falls short, we inspect accessible areas for leakage paths. Common findings include gaps beneath doors, unsealed cable sleeves, joints around ductwork and openings hidden below raised floors. We document the observed defects so the responsible contractor can complete repairs before retesting.

Accurate Testing & Assessment

Reliable Room Integrity Test Results

Room integrity testing provides a measured assessment of enclosure leakage and predicted agent hold time. The process helps identify whether the protected room can retain the required extinguishing agent for the specified period.

Our testing approach considers the enclosure boundary, ventilation conditions and the actual configuration of the protected space to help produce results that can be reviewed by the project team.

Door fan testing for clean agent room integrity assessment
Documentation & Results

What You Receive

Our room integrity test report identifies the enclosure tested, the suppression agent, the protected volume and height, and the door and ventilation conditions during testing.

It records the leakage result, the predicted hold time alongside the required hold time, and whether the room met the stated criterion.

Room Integrity Test Report

Where corrective work is needed, the report identifies observed leakage points and provides a reference for the follow-up test.

  • Enclosure and suppression agent details
  • Protected volume and protection height
  • Door and ventilation conditions during testing
  • Measured leakage result
  • Predicted hold time and required hold time
  • Pass or fail against the stated criterion
  • Observed leakage points requiring attention

If the project also requires a discharge pressure-relief assessment, we identify it separately in the scope. That assessment considers the pressure the enclosure may experience during agent discharge and the venting needed to protect it.

Description

Clean-agent fire suppression systems are used in applications where specialised fire protection is required. Great Win Fire & Safety LLC supports clean-agent suppression requirements through equipment supply and installation, according to the project scope and applicable fire safety requirements.

Our company profile lists FM-200 equipment among our fire protection capabilities and identifies support for refilling suppression cylinders containing agents such as FM-200 (HFC-227ea), NOVEC 1230, NAF S 125, IG-55, and IG-541.

We also provide cylinder hydrotesting, leakage testing, and related certification support through our in-house refilling facility. These services help clients address the inspection, testing, and refilling needs of their fire suppression equipment.

Book an Appointment

Need support with clean-agent fire suppression equipment, cylinder refilling, or system maintenance? Contact Great Win Fire & Safety LLC to discuss your requirements and the scope of service needed.

Contact Form
Emergency Call 24/7

+971 54 420 5727

Our Capability

Clean-Agent Fire Protection Support

Our listed capabilities cover FM-200 equipment, suppression cylinder refilling, testing, and related fire protection services. The specific scope is determined by the project requirements and the equipment involved.

Our capabilities cover key stages of fire protection project delivery, from system design and equipment selection to installation, testing, commissioning, and ongoing maintenance.

FM-200 Fire Suppression
0%
Suppression Agent Refilling
0%
Hydrotesting & Leakage Testing
0%
Inspection & Certification Support
0%

Why Choose Us

Specialised Fire Protection & Cylinder Support

Established in 2018, Great Win Fire & Safety LLC provides fire protection and life safety services across Dubai and Abu Dhabi, including clean-agent equipment and suppression cylinder support.

In-House Refilling Facility

Our company profile identifies an in-house facility for fire suppression cylinder refilling and fire extinguisher recharge services.

Testing & Documentation

Our services include cylinder hydrotesting, leakage testing, and relevant certificates for the work performed.

Ongoing Service Support

We provide maintenance support and 24/7 AMC services across Dubai and Abu Dhabi.